Support & downloads
Documentation, firmware sources, warranty terms and technical contact.
Downloads
| File | Type | Version | Date | Size |
|---|---|---|---|---|
| YivaDrone Product Catalog | catalog | v0.1 | 2026-08-31 | PDF · 1 KB |
| YD-Explorer 450 Datasheet | datasheet | v0.1 | 2026-08-31 | PDF · 1 KB |
| YD-Researcher 600 Datasheet | datasheet | v0.1 | 2026-08-31 | PDF · 1 KB |
| YD-Swift 250 Datasheet | datasheet | v0.1 | 2026-08-31 | PDF · 1 KB |
| YD-Voyager VTOL Datasheet | datasheet | v0.1 | 2026-08-31 | PDF · 1 KB |
| YD-Pilot Pro Datasheet | datasheet | v0.1 | 2026-08-31 | PDF · 1 KB |
| YD-Core NX16 Datasheet | datasheet | v0.1 | 2026-08-31 | PDF · 1 KB |
| YD-Core NX8 Datasheet | datasheet | v0.1 | 2026-08-31 | PDF · 1 KB |
| YD-Link 10 Datasheet | datasheet | v0.1 | 2026-08-31 | PDF · 1 KB |
Documentation & firmware
Product wiki
Assembly guides, wiring and tuning — portal pending
Firmware sources
PX4 / ArduPilot boards target — repository pending
ROS packages
MAVLink↔DDS bridge — repository pending
Frequently asked questions
Can we order a custom airframe configuration?
Yes — custom motor/propeller combinations, payload mounts and connector pinouts are quoted on request. Typical engineering lead time is 3–4 weeks.
What is the warranty?
Airframes carry a 12-month limited warranty against manufacturing defects; avionics 24 months. Crash damage is excluded — spare parts kits are priced for a season of student handling.
Which ground station software is supported?
QGroundControl and Mission Planner, out of the box, over the YD-Link 10 or USB.
Do you ship internationally?
Yes. We ship worldwide with battery-compliant logistics — export paperwork is handled on our side. Contact sales for destination-specific lead times.
Warranty & RMA
1. Contact support
Email support@yivadrone.com with the serial number and a description of the issue.
2. Diagnosis
An engineer responds within 2 business days with either a fix or an RMA number and shipping instructions.
3. Repair or replace
Warranty repairs are returned within 15 working days of arrival; advance replacement is available for critical projects.